August 21, 2018

The ‘large crew supervisor’ must make a choice to reduce (or eliminate) his own productivity in order to keep five men up to speed, or allow their productivity to drop to maintain individual productivity.

Most large crew supervisors do a little bit of both and lose both...

August 14, 2018

One drawback of small crews on large properties is they cannot complete the work fast enough.  They spend too much time on-site, or do not get the job done on time.  One answer to that problem is increasing the crew size.  All that is needed is a crew-cab truck and a f...

August 7, 2018

In sidewalk snow removal work we do not perform activities that offer opportunity for positive synergistic effect.  In fact, we have the opposite.  When we increase the crew size, we lose efficiency.  For example; send one person to do a job that takes 4.0 hours of ela...

Please reload

Featured Posts

The Causing of Snow

February 26, 2019

1/1
Please reload

Recent Posts

February 26, 2019

February 20, 2019

Please reload

Follow Us
  • LinkedIn Social Icon
POSTS
Please reload

John Allin Consulting

P.O. Box 8503 Erie, PA 16505​​

Tel: 814-452-3919  |  ​Email: john@johnallin.com

© Copyrighted John Allin Consulting Inc.  2019